Aerodium Slovenia also known as Aerodium Logatec is a 12 foot / 3.7 meter diameter open flow wind tunnel being built by Aerodium Technologies in Slovenia. The tunnel is planned to be open in mid to late 2015.

This tunnel is of a unique design. The tunnel is an open flow tunnel except unlike other open flow tunnels (see: SkyVenture Arizona) the fans sit below the chamber and use one set of turning vanes to turn the air up into a contractor and then through a vertical fight chamber. See the diagram in the photos for this tunnel for a diagram of the function of this tunnel provided by Aerodium.

Tunnel Address

Tunnel Information

Please use the following format: 170 mph (274 km/h)

First Time Flyers:
Mon-Thurs: 2 Minutes 45 EUR
Fri-Sun: 2 Minutes 50 EUR

Pro Flyers:
Mon-Thurs: 450 EUR/Hour
Fri-Sun: 500 EUR/Hour

Ljubljana Jože Pučnik Airport (LJU) (50 km)

Your Information


*Please add your information in the fields above to reveal the SUBMIT button.